Search
Close this search box.

Log in

Top Stories

The final designs were completed for a full-scale renovation of Tom Golisano Field House, which is home to Ave Maria University’s men’s and women’s basketball and women’s volleyball teams, as well as the sports medicine and strength and conditioning programs. Built in 2011, the 40,000-square-foot pre-engineered building at 4810 Kelleher St. in Ave Maria is being renovated and modernized inside and out with design plans from BSSW Architects. Outside, the building will feature insulated metal and translucent panels as well as exposed ground face block. Brick pavers and tropical landscaping complement the new exterior expression. Inside, the gymnasium will be spacious enough to host campus events, with a sound-proof curtain to split competition and practice courts that allow multiple teams to have practices or games at the same time. The design includes all-new playing surfaces in the gym, locker rooms, athletic department offices and training spaces. The project is expected to be completed in summer 2023. 

Copyright 2024 Gulfshore Life Media, LLC All rights reserved. This material may not be published, broadcast, rewritten or redistributed without prior written consent.

Don't Miss

Please enable JavaScript in your browser to complete this form.

Please note that article corrections should be submitted for grammar or syntax issues.

If you have other concerns about the content of this article, please submit a news tip.
;